COMMERCIAL EPOXY FLOORING

WHAT MAKES UP OUR EPOXY FLOORING?

Proper preparation is critical. These steps will ensure a long lasting floor.

  • Diamond grind every floor
  • Patch existing cracks and pits
  • Epoxy base coat with built in moisture barrier
  • 3-Part Urethane Top Coat with Slip-Resistant Additive

Our complete installation takes just 2 days.

*Days needed will depend on total square footage.

Step 1

Preparation of existing concrete floor.

Step 2

Apply epoxy base coat.

Step 3

Apply top coat finish.

*One-day timeframe estimate applies to most 2 car garages. Weather permitting.

HOW LONG DOES IT TAKE TO INSTALL?

Our complete installation can take just 2 days, depending on the total square footage of the space.

BENEFITS

icon-custom

Customizable
Plenty of color combinations for you to choose from.

icon-save-money

Save Money
Our epoxy floors simply look better and last longer. They resist staining, peeling, and other possible causes for maintenance.

icon-low-maintenance

Low Maintenance
Working on cars or tracking in dirt? Mess comes off easily instead of staining the concrete.

icon-002

Durable
Our Epoxy base and Polyaspartic top coat makes a winning combination that is built to last.

3-PART URETHANE TOP COAT

A premium 3 component urethane with slip resistant additive that provides superior performance without any odor, health or environmental issues. It provides a hard, durable coating that features a gloss or matte look with UV and abrasion resistance.