COMMERCIAL EPOXY FLOORING
- Diamond grind every floor
- Patch existing cracks and pits
- Epoxy base coat with built in moisture barrier
- 3-Part Urethane Top Coat with Slip-Resistant Additive
Our complete installation takes just 2 days.
*Days needed will depend on total square footage.
Step 1
Preparation of existing concrete floor.
Step 2
Apply epoxy base coat.
Step 3
Apply top coat finish.
*One-day timeframe estimate applies to most 2 car garages. Weather permitting.
BENEFITS
Customizable
Plenty of color combinations for you to choose from.
Save Money
Our epoxy floors simply look better and last longer. They resist staining, peeling, and other possible causes for maintenance.
Low Maintenance
Working on cars or tracking in dirt? Mess comes off easily instead of staining the concrete.
Durable
Our Epoxy base and Polyaspartic top coat makes a winning combination that is built to last.
3-PART URETHANE TOP COAT
A premium 3 component urethane with slip resistant additive that provides superior performance without any odor, health or environmental issues. It provides a hard, durable coating that features a gloss or matte look with UV and abrasion resistance.