EPOXY FLOORING

WHAT MAKES UP OUR EPOXY FLOORING?

Proper preparation is critical. These steps will ensure a long lasting floor.

  • Diamond grind every floor
  • Patch existing cracks and pits
  • Epoxy base coat with built in moisture barrier
  • ¼” Vinyl Flakes with Full Broadcast
  • Polyaspartic Top Coat

Our complete installation takes just 1 day. 

Day 1

We install every aspect of your epoxy flooring

Day 2

Your floor is dry enough to walk on.

Day 5

You can drive on it.

*One-day timeframe estimate applies to most 2 car garages. Weather permitting.

HOW LONG DOES IT TAKE TO INSTALL?

Our complete installation takes just 1 day.

BENEFITS

icon-custom

Customizable
Plenty of color combinations for you to choose from.

icon-save-money

Save Money
Our epoxy floors simply look better and last longer. They resist staining, peeling, and other possible causes for maintenance.

icon-low-maintenance

Low Maintenance
Working on cars or tracking in dirt? Mess comes off easily instead of staining the concrete.

icon-002

Durable
Our Epoxy base and Polyaspartic top coat makes a winning combination that is built to last. Even hot tires won’t peel these floors.

icon-003

Better Traction
We include 3x the flakes needed in our full-broadcast flake floors. Less slip, more grip.

POLYASPARTIC TOP COAT

Our polyaspartic top coat protects your floor from chemicals and stains, to help your floor look better and last longer. This top coat also prevents UV rays from fading the color of your floors. In addition, our polyaspartic top coat will prevent heat damage, so you don’t have to worry about hot tires peeling your floor.

Our polyaspartic top coat also has a crystal clear finish with a long-lasting shine, so your floor will always look as good as new.

Our polyaspartic top coat allows your floors to have durable strength and an attractive look.

Our polyaspartic top coat can be cleaned with a simple detergent and wash, and that’s all you’ll ever need.